Report of the Planning and Development Manager recommending delegated authority be granted in respect of an application for a proposed development at the above address, attached.
Minutes:
The Panel considered the report of the Planning and Development Manager recommending delegated authority be granted in respect of an application for a proposed development at the above address. (Copy of the report circulated with the agenda and appended to the signed minutes).
Full permission sought for Phase 3 of the Centenary Quay development with a mixed residential and employment use comprising 329 residential units (102 x one bedroom, 178 x two bedroom and 49 x three bedroom units), a food store (Class A1 - 5,500 square metres), commercial space (Classes A1/A2/A3/A4 or B1 - 1,685 sq. m) and a management suite (84 sq. m) in buildings ranging in height from four-storeys to twelve-storeys with associated basement car parking and cycle parking, landscaped public and private open spaces, servicing and other works including junction improvements and temporary access to the rivers edge. (Environmental Impact Assessment Development).
Ms Alpin (Applicant) and (Mr Hall) (Applicant) were present and with the consent of the Chair, addressed the meeting.
The presenting officer updated the Panel on the S106 agreement (xxii) that the public toilet from Phase 2 of the library no longer proposed to be deleted and that paragraph 6.10.1 should be amended with this change. The presenting officer also reported that the last sentence for the reason for granting permission should refer to Phase 3.
RESOLVED unanimously that authority be delegated to the planning and Development Manager to grant planning permission submitted to criteria listed in the report and subject to the following the amended S106 condition and amended planning conditions:
S106 agreement
(xvi) The setting up and establishment of a management company for a long term maintenance of the River Itchen edge:
Amended Conditions
26 APPROVAL CONDITION – Refuse Management
Self closing rubbish bins shall be provided for the disposal of putrescible waste in accordance with details of a refuse and litter management plan for both public and private areas of the development that shall have been submitted and agreed prior to the first occupation of the development. The approved details shall include a management strategy for the emptying of the bins on a regular basis to prevent the build up of waste materials across the development and shall be implemented in accordance with the agreed details prior to the occupation of the development.
REASON:
To avoid endangering the safe operation of aircraft through the attraction of birds and in the interests of hygiene
50 APPROVAL CONDITION - BREEAM Standards (commercial development)
Written documentary evidence demonstrating that the development has achieved at minimum an overall rating of Very Good against the BREEAM standard, with Excellent level on the minimum standards (as indicator on the pre-assessment estimators dated 28/03/12) shall be submitted to the Local Planning Authority and verified in writing prior to the first occupation of the development hereby granted, unless an otherwise agreed timeframe is agreed in writing by the LPA. The evidence shall take the form of a post construction certificate as issued by a qualified BREEAM certification body.
Reason:
To ensure the development minimises its overall demand for resources and to demonstrate compliance with policy CS20 of the Local Development Framework Core Strategy Development Plan Document Adopted Version (January 2010).
Supporting documents: